Yahoo Messenger
|

Cables | Diagnostic Testing Condition Monitoring Pre-fault Site Location Examples of Cables that can be PD Tested: - Both 3-Core and Single-Core Cables
- 'Mixed' cables with transition joints
| Switchgear  | Diagnostic Testing Condition Monitoring Examples of Switchgear that can be PD Tested using TEV and acoustic sensors: - AIS – Air Insulated Switchgear
- SIS – Solid Insulated Switchgear
- GIS – Gas Insulated Switchgear
| Motors & Generators  | Diagnostic Testing Condition Monitoring 'Machines Software Module'
- PD measurements can be made On-Line using split-core,HFCT sensors around the supply cable.
- PD measurements in pico-Coulombs (pC’s).
- Automatic diagnostic of whether the discharge is in the Slot Section or the End Windings.
| Transformers
|
Diagnostic Testing Condition Monitoring
- PD activity occurs in the HV bushings and the windings of MV/HV transformers and can be detected using internal bushing 'taps' or, in some cases, external TEV sensors.
- HFCT sensors can normally be attached to the earths of the MV/HV cables connected to the transformer.
- Location of the origin of a PD site can be made with distributed TEV probes on the LV and HV side, if there are suitable ‘pathways’ for the PD signals to come out of the tranformer.
|
|
Copyright 2009 PT. DINAMIKA ELEKTRA MANDIRI.
Design by kk-comp.com